Description
Location: Husqvarna Construction Products UK
Unit 2A Outgang Lane, Dinnington, Sheffield, S25 3QU.
Duration: One day
Time: 10:00 – 17:30
Itinerary:
■ Overview of Surface Preparation
■ Concrete Surface Profiles (CSPs)
■ Different surface preparation techniques
■ Removal of existing materials and coatings – Shot blasting, grinding, scarifying, shaving and floor scraping
■ Concrete dust awareness and concrete dust management
■ Hands on training
Lunch provided.
Practical use on a selection of grinders and vacuums using different segments on substrates and other materials.
Hotel available if required, link below.
(Available at a discounted rate). Ask me for details
Contact The Crown Hotel Bawtry | Doncaster (crownhotel-bawtry.com)
Reviews
There are no reviews yet.